Working bee 17 Jan 2019

Watered for 3.5 hours in the gully late this afternoon. Ran the hoses down the hill from a nearby property. With all hoses combined we had 200 metres of hose connected to a 3 way. This is not a solution to our watering problem precinct-wide but for these lucky few plants it’s a welcome saviour.

Pruned the salt bush and over hanging branches on the path leading up to the Pelican steps.

Leave a Reply

Your email address will not be published. Required fields are marked *